
A group of workers, aided by a steam-roller, are leveling the ground during the construction of the Jonage canal, a diversion of the Rhône river, which was built in order to supply the hydroelectric plant of Cusset.
Good for a quick watch and talking about after.
Close in feeling, tone and story.
A different format. A familiar feeling.